{"id":1894,"date":"2015-05-28T16:39:09","date_gmt":"2015-05-28T15:39:09","guid":{"rendered":"http:\/\/www.future-tech.co.uk\/2020\/07\/09\/professionalism-marks-future-tech-out-at-mylan\/"},"modified":"2022-08-02T09:44:45","modified_gmt":"2022-08-02T08:44:45","slug":"professionalism-marks-future-tech-out-at-mylan","status":"publish","type":"post","link":"https:\/\/www.future-tech.co.uk\/professionalism-marks-future-tech-out-at-mylan\/","title":{"rendered":"Professionalism marks Future-tech out at Mylan"},"content":{"rendered":"<p>[et_pb_section admin_label=&#8221;section&#8221;]<br \/>\n\t\t\t[et_pb_row admin_label=&#8221;row&#8221;]<br \/>\n\t\t\t\t[et_pb_column type=&#8221;4_4&#8243;][et_pb_text admin_label=&#8221;Text&#8221;]<\/p>\n<h3><\/h3>\n<p>Future-tech\u2019s approach to a new-build computer facility for pharmaceutical business Mylan, not only created an impression of extreme professionalism with the client, but also won the specialist data centre contractor a second project on the back of the first.<\/p>\n<h3>THE BRIEF<\/h3>\n<p>When Mylan\u2019s UK Information Systems Manager, Mike Thurston was looking for a contractor to construct a new computer room at his company\u2019s Potter\u2019s Bar site, Future-tech was the stand-out candidate for the job. Mylan was reconfiguring the way it uses its UK headquarters building and saw the opportunity to move its key systems equipment from a small fourth floor server room to a new-build space on the first floor.<\/p>\n<p>&nbsp;<\/p>\n<h3>CHALLENGES AND CONSTRAINTS<\/h3>\n<h3><\/h3>\n<p style=\"font-style: inherit; font-weight: inherit;\">The main challenge within this project was all works had to be carried out at the weekend and therefore, this involved some sensitive negotiation with Mylan, their landlord and the relevant Network Rail departments \u2013 Future-tech needed a solution.<\/p>\n<p>&nbsp;<\/p>\n<h3>THE FUTURE-TECH SOLUTION<\/h3>\n<p>The design and build of the new micro data centre took advantage of Mylan\u2019s own systems consolidation that now enables them to derive far more computing power from far fewer cabs.\u00a0<span style=\"font-style: inherit; font-weight: inherit;\">We stripped out and refurbished the space, installed the raised access flooring and a new suspended ceiling, along with all the switchgear and other electrical systems and the network cabling. Key to the project was providing more efficient, energy saving, UPS systems and cooling. The building is above Network Rail\u2019s Potter\u2019s Bar Station and involved dismantling existing condensers on the roof and installing two new air handling units.\u00a0<\/span>The works were carried out on site during the working week and on several weekends and there was no disruption to Mylan. Future-tech were later commissioned for their power and data upgrade including CAT6 data cabling across the first floor of the data centre building.<\/p>\n<p>Both Projects were completed on time and within budget, providing Mylan with an efficient computer room to support their systems.<\/p>\n<p>&nbsp;<\/p>\n<blockquote><p>One of the key aspects to the Future-tech relationship is that we have access to the whole company, from the Engineers to the Managing Director<\/p><\/blockquote>\n<p><span class=\"quote-author\">STEVE WATT, CHIEF INFORMATION OFFICER, ST ANDREW\u2019S UNIVERSITY<\/span>[\/et_pb_text][\/et_pb_column]<br \/>\n\t\t\t[\/et_pb_row]<br \/>\n\t\t[\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Future-tech\u2019s approach to a new-build computer facility for pharmaceutical business Mylan, not only created an impression of extreme professionalism with the client, but also won the specialist data centre contractor a second project on the back of the first. THE BRIEF When Mylan\u2019s UK Information Systems Manager, Mike Thurston was looking for a contractor to [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"on","_et_pb_old_content":"<h3><\/h3>\nFuture-tech\u2019s approach to a new-build computer facility for pharmaceutical business Mylan, not only created an impression of extreme professionalism with the client, but also won the specialist data centre contractor a second project on the back of the first.\n<h3>THE BRIEF<\/h3>\nWhen Mylan\u2019s UK Information Systems Manager, Mike Thurston was looking for a contractor to construct a new computer room at his company\u2019s Potter\u2019s Bar site, Future-tech was the stand-out candidate for the job. Mylan was reconfiguring the way it uses its UK headquarters building and saw the opportunity to move its key systems equipment from a small fourth floor server room to a new-build space on the first floor.\n\n&nbsp;\n<h3>CHALLENGES AND CONSTRAINTS<\/h3>\n<h3><\/h3>\n<p style=\"font-style: inherit; font-weight: inherit;\">The main challenge within this project was all works had to be carried out at the weekend and therefore, this involved some sensitive negotiation with Mylan, their landlord and the relevant Network Rail departments \u2013 Future-tech needed a solution.<\/p>\n&nbsp;\n<h3>THE FUTURE-TECH SOLUTION<\/h3>\nThe design and build of the new micro data centre took advantage of Mylan\u2019s own systems consolidation that now enables them to derive far more computing power from far fewer cabs.\u00a0<span style=\"font-style: inherit; font-weight: inherit;\">We stripped out and refurbished the space, installed the raised access flooring and a new suspended ceiling, along with all the switchgear and other electrical systems and the network cabling. Key to the project was providing more efficient, energy saving, UPS systems and cooling. The building is above Network Rail\u2019s Potter\u2019s Bar Station and involved dismantling existing condensers on the roof and installing two new air handling units.\u00a0<\/span>The works were carried out on site during the working week and on several weekends and there was no disruption to Mylan. Future-tech were later commissioned for their power and data upgrade including CAT6 data cabling across the first floor of the data centre building.\n\nBoth Projects were completed on time and within budget, providing Mylan with an efficient computer room to support their systems.\r\n\r\n&nbsp;\r\n<blockquote>One of the key aspects to the Future-tech relationship is that we have access to the whole company, from the Engineers to the Managing Director<\/blockquote>\r\n<span class=\"quote-author\">STEVE WATT, CHIEF INFORMATION OFFICER, ST ANDREW\u2019S UNIVERSITY<\/span>","_et_gb_content_width":"","footnotes":""},"categories":[18,34],"tags":[],"class_list":["post-1894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies","category-design"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/posts\/1894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/comments?post=1894"}],"version-history":[{"count":0,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/posts\/1894\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/media\/1895"}],"wp:attachment":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/media?parent=1894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/categories?post=1894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/tags?post=1894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}