{"id":8027,"date":"2023-04-20T15:27:08","date_gmt":"2023-04-20T14:27:08","guid":{"rendered":"https:\/\/www.future-tech.co.uk\/?p=8027"},"modified":"2023-04-20T15:27:14","modified_gmt":"2023-04-20T14:27:14","slug":"the-importance-of-data-centre-maintenance","status":"publish","type":"post","link":"https:\/\/www.future-tech.co.uk\/the-importance-of-data-centre-maintenance\/","title":{"rendered":"The Importance of Data Centre Maintenance"},"content":{"rendered":"\n<p>One of the biggest areas of contention when it comes to data centres, is \u2018who looks after it?\u2019 &#8211; is it Estates, the IT department, or somebody else entirely?<\/p>\n\n\n\n<p>In reality, this doesn\u2019t matter; what does matter is that maintenance is done properly and that a Data Centre Planned Preventative Maintenance (PPM) schedule is created to ensure operational uptime and efficiency is optimised throughout the life of the data centre.<\/p>\n\n\n\n<p>My good friend Scott Roots from Uptime Institute helped me with some interesting data, that emphasises the importance of Planned Preventative Maintenance in data centres:<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"583\" height=\"358\" src=\"https:\/\/www.future-tech.co.uk\/wp-content\/uploads\/2023\/04\/Importance-of-data-centre-maintenance-Picture1.png\" alt=\"\" class=\"wp-image-8028\" srcset=\"https:\/\/www.future-tech.co.uk\/wp-content\/uploads\/2023\/04\/Importance-of-data-centre-maintenance-Picture1.png 583w, https:\/\/www.future-tech.co.uk\/wp-content\/uploads\/2023\/04\/Importance-of-data-centre-maintenance-Picture1-480x295.png 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 583px, 100vw\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Poor, or no, data centre maintenance is one of the main causes of unplanned downtime for businesses. If a business cannot operate for an extended time, the financial impact of a data centre outage on a business is somewhere between \u00a3100,000 to \u00a31 million, in both direct and indirect costs. <\/p>\n\n\n\n<p>It is estimated around 45% of data centre failures could have been avoided if Planned Preventative Maintenance had been implemented.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"547\" height=\"378\" src=\"https:\/\/www.future-tech.co.uk\/wp-content\/uploads\/2023\/04\/Importance-of-data-centre-maintenance-Picture2.png\" alt=\"\" class=\"wp-image-8030\" srcset=\"https:\/\/www.future-tech.co.uk\/wp-content\/uploads\/2023\/04\/Importance-of-data-centre-maintenance-Picture2.png 547w, https:\/\/www.future-tech.co.uk\/wp-content\/uploads\/2023\/04\/Importance-of-data-centre-maintenance-Picture2-480x332.png 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 547px, 100vw\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Regular data centre maintenance is an essential part of data centre operations. When deploying a data centre, ongoing care should be as essential as the deployment, and not an afterthought once constructed. <\/p>\n\n\n\n<p>Even if you have a legacy data centre, you should still implement Planned Preventative Maintenance to ensure an older facility still operates as originally designed. <\/p>\n\n\n\n<p>In fact, the older a data centre becomes, the more important the maintenance becomes as critical equipment ages and approaches the end of reliable life. In short, a well-planned and proactive data centre maintenance schedule is essential to keep any data centre operating efficiently and effectively.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What are the benefits of Planned Preventative Maintenance?<\/strong> <\/h3>\n\n\n\n<p>These are listed below:<\/p>\n\n\n\n<ol class=\"wp-block-list\" type=\"1\">\n<li>PPM will ensure any new equipment maintains its warranty status.<\/li>\n\n\n\n<li>Prevent small problems from escalating into larger issues or outages.<\/li>\n\n\n\n<li>Maximised equipment lifecycle and reliability and make the best possible use of the capital deployed.<\/li>\n\n\n\n<li>Improve energy efficiency and operating expenditure.<\/li>\n\n\n\n<li>Ensure that the data centre continues to operate as originally designed.<\/li>\n\n\n\n<li>Keep up to date with the latest software and firmware updates, systems technology, and emerging data centre best practices.<\/li>\n\n\n\n<li>Better sleep at night.<\/li>\n<\/ol>\n\n\n\n<p>While I joke about better sleep at night, Future-tech maintains over 100 data centres across England, Ireland, and Scotland, with the purpose of ensuring our client\u2019s data centres operate at peak performance according to their original design parameters. <\/p>\n\n\n\n<p>A Data Centre is a complex thing and is generally built to provide reliability and resilience for business operations, so it is essential that it operates correctly in order to properly support business-critical services. <\/p>\n\n\n\n<p>Do you have the experienced electrical and mechanical engineers required to run a data centre, and do you want to directly take on the business risk of managing a data centre without the correct skills and experience?<\/p>\n\n\n\n<p>The purpose of Planned Preventative Maintenance is to catch small problems early and avoid them escalating into much bigger ones; while ensuring that if an issue does occur it is resolved quickly, efficiently and by Data Centre qualified engineers. <\/p>\n\n\n\n<p>If you are not already doing this, <a href=\"https:\/\/www.future-tech.co.uk\/contact-us\/\" title=\"\">contact Future-tech<\/a>; we will help you find a suitable solution to ensure that you do not suffer unexpected downtime in your data centre.<\/p>\n\n\n\n<p><strong>Next in the series ( next week \/ Month \/ Year ): Equipment-Specific Maintenance<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the biggest areas of contention when it comes to data centres, is \u2018who looks after it?\u2019 &#8211; is it Estates, the IT department, or somebody else entirely? In reality, this doesn\u2019t matter; what does matter is that maintenance is done properly and that a Data Centre Planned Preventative Maintenance (PPM) schedule is created [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":8038,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[20,37],"tags":[],"class_list":["post-8027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","category-maintenance-management"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/posts\/8027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/comments?post=8027"}],"version-history":[{"count":0,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/posts\/8027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/media\/8038"}],"wp:attachment":[{"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/media?parent=8027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/categories?post=8027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.future-tech.co.uk\/wp-json\/wp\/v2\/tags?post=8027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}